Lee Forest Reservoir Improvements, Snohomish, WA
The Lee Forest Reservoir Improvements project includes a seismic retrofit and interior and exterior recoating of the existing 1.0 MG Lee Forest Reservoir. This project also includes site improvements such as the construction of a new 2.2 MG steel reservoir, water site piping, storm site piping, and the construction of a stormwater detention pond. Three valve vaults will also be constructed in order to control and monitor the flows of the two reservoirs on site. In order to construct the new reservoir, approximately 105 trees will be removed in addition to other shrubs and brush onsite. Restoration of the site will include gravel surfacing and hydroseed along with new site fencing and gates.