Browse all Washington
Tree Canopy Expansion and Irrigation, Redmond, WA
The City is soliciting bids from licensed contractors to provide labor and material to complete tree canopy expansion and install temporary irrigation system across three (3) city sites. Provide labor and materials to complete site preparation, plant trees and/or shrubs per detail, install a temporary irrigation system or seasonal watering as specified per site, and provide three (3) years of maintenance on a total of 40,000 sf of property at three separate work sites in Redmond, WA.
2026 Local Access Project, Spokane Valley, WA
The project consists of asphalt removal, HMA paving, minor patching, miscellaneous stormwater and concrete flatwork.
RFSQ Cedar Downs Water Quality Retrofit Project, Maple Valley, WA
The City of Maple Valley (the City) is soliciting qualifications from consultant firms to provide professional construction management services for the Cedar Downs Water Quality Retrofit Project. The successful firm will have experience in contract administration, contractor/construction management, inspection, and materials testing requirements for improvements and retrofits to existing stormwater conveyance, treatment and detention systems. The City invites interested parties to respond to this Request for Qualifications (RFQ) by submitting their qualifications relating to this type of project. The Agreement is anticipated to start in the summer of 2026 and end by summer of 2027.
Feeder 7 Construction & Feeder 1 Line Extension, Ellensburg, WA
The purpose of this call for bids and specifications supervision, equipment and materials, and a three phase line extension where specified, to existing underground line work, excavation, backfill Feeder is to obtain a contractor for the construction to provide labor, of a new Feeder 7 1. The work will include overhead and restoration, will provide service to a large commercial distribution and duct and vault installation. warehouse
25-27 Electrical Infrastructure - Tacoma Community College, Tacoma, WA
New Day Use Facilities and Trail Development at Anderson Lake State Park, Chimacum, WA
Paving the parks main road, paving the trail and construction of boardwalk along a section of trail, removal of the existing vault restrooms and construction of two new CXTs. 10% for Minority Business Enterprises (MBE), 6% for Womens Business Enterprises (WBE), 5% for Washington Small Businesses, and 5% for Veteran-owned businesses. While meeting these goals is not mandatory, it is strongly encouraged to promote diversity in business participation.
Eastrail to NE Spring Boulevard Trail Link, Bellevue, WA
SVC-Roberts Hall Re-roof and Clerestory Repair - Skagit Valley College, Mt Vernon WA
PIE - Admin Remodel - Pierce College, Puyallup, WA
RFP Point Roberts Middle Mile Infrastructure Project: Race Road to Moran’s Beach, Whidbey Island, WA
The goal of this project is to construct 25 miles of new terrestrial underground fiber optic middle mile infrastructure on Washington State Route 20 from Race Rd. to Waterloo Rd. and from Ault Field Rd to Banta Rd. as well as on Heller Rd., Ault Field Rd., Banta Rd., Moran Rd., and Powell Rd. on Whidbey Island, in Island County, Washington.
West E Street Improvements, Forks, WA
This contract provides roadway improvements for West E Street from the intersection of 5th Avenue and West E Street to the intersection of Forks Avenue (US Hwy 101) and West E Street. Work includes, but is not limited to, pulverization of the existing pavement, pavement pulverization, shaping, and paving of the full roadway width ( 22) for approximately 1,793 linear feet. Additional work includes construction of a paved sidewalk along the north side of West E Street, installation of concrete curb with scuppers, drainage improvements, ADA ramps, permanent pavement markings, permanent signage, erosion & sediment control, traffic control, and all other work necessary to complete the project.
Yacolt Chip Seal 2026, Yacolt, WA
Aqua Vista Sewer Replacement Project, Bellevue, WA
IW Force Main Replacement, Yakima, WA
This Contract provides for the installation of 1,435 feet of 8-inch HDPE force main, fittings and appurtenances, including the trenching, bedding, backfill and surface restoration, and all other work.
NE Big Rock Road Overlay, King Co, WA
Provides for the improvement of NE Big Rock Road (3.23 miles) from the Duvall City limit to Kelly Road NE in King County by removal of pavement markings, raised and recessed pavement markers, planning bituminous surfaces (2.25 inch grinding), shoulder preparation, pavement repair, placing crushed surfacing, 2.25 inch overlay with hot mix asphalt, permanent striping, raised pavement marker, and other work. Subcontracting opportunities: traffic control, paint traffic lines, crosswalks, stop line, and add raised traffic markers.
Bowers Field Hangar Taxilane Complex Project, Kittitas Co, WA
The project consists of, but is not limited to, the construction of approximately 850 linear feet of new taxilanes for General Aviation Aircraft and Hangar development. Object free area grading; drainage improvements consisting of V-ditches, culvers, swales, and/or drywells; removal and replacement of approximately 1,150 linear feet of airport perimeter fencing; installation of pavement markings; and other items of work.
RFP HVAC Maintenance, Repair, and Support Services for Cathcart Firing Range, Snohomish Co, WA
Snohomish County is seeking proposals from qualified firms to provide preventative maintenance, filter replacement, inspection, and on-call repair services for the HVAC systems serving the Cathcart Firing Range.
Millwood Preschool Restroom & Office Renovations, Spokane, WA
Renovation of existing restroom, custodial room and office spaces within existing early learning center to support early learning needs. Utility modifications to support the updated spaces. This work will take place on an existing school site currently occupied by the Owner.
W Fir Street Sidewalk Improvements, Connell, WA
Project Description: The Work includes the installation of 14 Americans with Disabilities Act (ADA)-accessible curb ramps, sidewalk improvements, storm drain improvements, asphalt patching, and other items, all in accordance with the Contract Plans, Contract Provisions, and Standard Specifications. The Work may include additive alternatives, including the installation of up to two additional ADA-accessible curb ramps, sidewalk improvements, storm drain improvements, an infiltration gallery, two catch basins, asphalt patching, asphalt overlay, and other miscellaneous work.
Counties in Washington
- Adams (3)
- Asotin (1)
- Benton (21)
- Chelan (9)
- Clallam (12)
- Clark (39)
- Cowlitz (14)
- Douglas (14)
- Franklin (7)
- Grant (9)
- Grays Harbor (13)
- Island (5)
- Jefferson (4)
- King (139)
- Kitsap (16)
- Kittitas (8)
- Lewis (14)
- Lincoln (3)
- Mason (4)
- Okanogan (9)
- Pacific (1)
- Pend Oreille (4)
- Pierce (1)
- Pierce (55)
- San Juan (5)
- Skagit (12)
- Skamania (2)
- Snohomish (46)
- Spokane (28)
- Statewide (3)
- Stevens (2)
- Thurston (15)
- Wahkiakum (1)
- Walla Walla (9)
- Whatcom (17)
- Whitman (3)
- Yakima (13)